Changes

Jump to: navigation, search

Testing Procedures for Power Engineering

11 bytes removed, 14:41, 23 April 2014
13.4.2.1 Electrical Life
U<sub>r</sub> = Recovery voltage
[[File:AC3 contact arc erosion of two differently produced Ag SnO<sub>2</sub> SnO2 contact materials.jpg|right|thumb|AC-3 contact arc erosion of two differently produced Ag/SnO<sub>2</sub> contact materials in a 37 kW contactor 1 Ag/SnO<sub>2</sub> 88/12, produced by conventional powder metallurgy with MoO<sub>3</sub> additive, extruded 2 Ag/SnO<sub>2</sub> 88/12, powder manufacturing by the reaction-spray process with CuO and Bi<sub>2</sub> O<sub>3</sub> additives, extruded]]
====13.4.2.2 Temperature Rise====

Navigation menu

Powered by