2,808
edits
Changes
→13.3.5 Testing Technology
These requirements lead to the need to simulate the real life loads through electronically controlled load circuits. Such computerized electronic load circuit simulations easily allow the test sequences to be controlled and monitored:
* Time saving test runs for lamp loads by reducing interval times Monitoring of each switching operation for electrical life criteria Allowing to recognize non separation of the contacts after a pre-set time limit to be classified as a relay fallure